Our Latest Demolition Projects
Demolition and dismantling services Across Bangalore and All Over Karnataka. Explore our completed apartment, factory and residential villa projects below, with details of the scope, equipment, completion time and material recovery arrangements.
These five featured projects in Bengaluru and Bengaluru Rural include direct client work and subcontract assignments. Open each case study to view site footage and supporting documents where available.
Malind Tropika Gardens
Iggalur · Chandapura–Anekal Road, Bengaluru
Top-down demolition of a basement, ground and nine upper-floor RCC building. The scope included foundation removal, material recovery and site clearance.
- Total built-up area
- 2,25,000 sq ft
- Completion time
- 4 months
Client: BSCPL Infrastructure Ltd. · Award letter and site footage available in the case study.
View Project →
Shreno Limited Factory Sheds
Alembic City · Whitefield, Bengaluru
Complete demolition of two factory sheds and internal alterations in two additional sheds. One excavator and more than 25 workers supported the work, with recovered materials taken by BCM.
- Total work area
- 1,20,000 sq ft
- Completion time
- 5 months
BCM’s role: Subcontractor appointed by engineer Amarnath.
View Project →
Devi Kiran Paper Mills
Kumbalgodu · Mysore Road, Bengaluru
Demolition and dismantling of 28,000 sq ft of RCC construction and 48,000 sq ft of shed structures. Three excavators and more than 25 workers completed the work within the client’s one-month deadline.
- Total structure area
- 76,000 sq ft
- Completion time
- 27 days
Client: Devi Kiran Paper Mills. · Completion certificate and site footage available in the case study.
View Project →
Exide Energy Solutions
Polanahalli · Devanahalli Taluk, Bengaluru Rural
Demolition of the single-storey Old Safety Lab building within an operating battery plant. Work included MS barricading, foundation removal, material recovery and debris clearance.
- Structure area
- 37,000 sq ft
- Completion time
- 45 days
Client: Exide Energy Solutions. · Work order and site footage available in the case study.
View Project →
27 Unfinished Residential Villas
Dodjala · Near Devanahalli International Airport
Complete demolition of 27 unfinished RCC villas, including foundation removal and debris clearance. Four excavators and more than 40 workers were deployed. BCM took the recovered materials.
- Combined built-up area
- 63,000 sq ft
- Completion time
- 4 months
BCM’s role: Subcontractor appointed by demolition contractor Uday Kumar for the Ideal Pro project.
View Project →Compare the completed works
Use this overview to find the project closest to your building type or demolition scope.
| Project | Main scope | Reported area | Duration |
|---|---|---|---|
| Malind Tropika Gardens | Top-down RCC building demolition, foundations and clearance | 2,25,000 sq ft built-up area | 4 months |
| Shreno Limited | Two sheds demolished; two sheds internally altered | 1,20,000 sq ft total work area | 5 months |
| Devi Kiran Paper Mills | RCC and shed demolition, dismantling and clearance | 76,000 sq ft structure area | 27 days |
| Exide Energy Solutions | Old Safety Lab demolition, foundations and clearance | 37,000 sq ft structure area | 45 days |
| 27 Residential Villas | Complete villa demolition, foundations and clearance | 63,000 sq ft combined built-up area | 4 months |
On mobile, swipe the table sideways to see all columns.
Areas describe different scopes. Shreno’s figure covers demolition and dismantling work, including internal alterations. Other figures describe built-up or structure areas. Completion periods are records of these projects, rather than estimates for a new site.
Frequently asked questions
What types of demolition projects are featured here?
These five projects cover multi-storey RCC apartment demolition, factory shed dismantling, internal shed alterations, paper mill demolition, an industrial lab building and unfinished residential villas. Each project page explains its individual scope.
Did BCM carry out all these projects as a direct contractor?
The projects include subcontract work. BCM was appointed by engineer Amarnath for the Shreno Limited shed works and by demolition contractor Uday Kumar for the 27-villa Ideal Pro project. These appointments are identified separately from the project company names.
Which projects included foundation removal and debris clearance?
Foundation removal and debris clearance formed part of the reported scopes at Malind Tropika Gardens, Devi Kiran Paper Mills, Exide Energy Solutions and the 27 residential villas. Shreno’s listed scope covers shed demolition, dismantling and internal alterations; foundation removal is not specified for that project.
Who retained the recovered demolition materials?
BCM took the recovered materials at Shreno Limited, Exide Energy Solutions and the 27-villa project under their respective arrangements. Material recovery was also part of the Malind and Devi Kiran scopes. The ownership and handling of recovered materials depend on each project’s agreement.
Can these completion times be used to estimate another project?
The durations show what was completed at these particular sites. For example, Devi Kiran’s 76,000 sq ft scope took 27 days, while Shreno’s demolition and internal alteration scope took five months. Structure type, access, surrounding operations, foundation work and the agreed scope all affect a new project’s schedule.
Where can I view project footage and supporting documents?
Select “View Project” on any card to open its full case study and site footage. The Malind case study includes an award letter, Devi Kiran includes a completion certificate, and Exide includes a work order. Supporting documents have not been added for the Shreno and 27-villa subcontract projects.