BCM Demolition Group · Projects & Case Studies
BCM Demolition Group projects and case studies

Our Latest Demolition Projects

Demolition and dismantling services Across Bangalore and All Over Karnataka. Explore our completed apartment, factory and residential villa projects below, with details of the scope, equipment, completion time and material recovery arrangements.

These five featured projects in Bengaluru and Bengaluru Rural include direct client work and subcontract assignments. Open each case study to view site footage and supporting documents where available.

Industrial shed demolition and dismantling work at Shreno Limited in Whitefield
Industrial demolition & dismantling

Shreno Limited Factory Sheds

Alembic City · Whitefield, Bengaluru

Complete demolition of two factory sheds and internal alterations in two additional sheds. One excavator and more than 25 workers supported the work, with recovered materials taken by BCM.

Total work area
1,20,000 sq ft
Completion time
5 months

BCM’s role: Subcontractor appointed by engineer Amarnath.

View Project
Old factory demolition and dismantling project at Devi Kiran Paper Mills
Industrial demolition & dismantling

Devi Kiran Paper Mills

Kumbalgodu · Mysore Road, Bengaluru

Demolition and dismantling of 28,000 sq ft of RCC construction and 48,000 sq ft of shed structures. Three excavators and more than 25 workers completed the work within the client’s one-month deadline.

Total structure area
76,000 sq ft
Completion time
27 days

Client: Devi Kiran Paper Mills. · Completion certificate and site footage available in the case study.

View Project
Old Safety Lab RCC building demolition project at Exide Energy Solutions
Industrial RCC demolition

Exide Energy Solutions

Polanahalli · Devanahalli Taluk, Bengaluru Rural

Demolition of the single-storey Old Safety Lab building within an operating battery plant. Work included MS barricading, foundation removal, material recovery and debris clearance.

Structure area
37,000 sq ft
Completion time
45 days

Client: Exide Energy Solutions. · Work order and site footage available in the case study.

View Project
Demolition project covering 27 unfinished RCC residential villas near Devanahalli International Airport
Residential demolition

27 Unfinished Residential Villas

Dodjala · Near Devanahalli International Airport

Complete demolition of 27 unfinished RCC villas, including foundation removal and debris clearance. Four excavators and more than 40 workers were deployed. BCM took the recovered materials.

Combined built-up area
63,000 sq ft
Completion time
4 months

BCM’s role: Subcontractor appointed by demolition contractor Uday Kumar for the Ideal Pro project.

View Project
Project scope at a glance

Compare the completed works

Use this overview to find the project closest to your building type or demolition scope.

Reported areas and completion periods for the five featured projects.
Project Main scope Reported area Duration
Malind Tropika Gardens Top-down RCC building demolition, foundations and clearance 2,25,000 sq ft built-up area 4 months
Shreno Limited Two sheds demolished; two sheds internally altered 1,20,000 sq ft total work area 5 months
Devi Kiran Paper Mills RCC and shed demolition, dismantling and clearance 76,000 sq ft structure area 27 days
Exide Energy Solutions Old Safety Lab demolition, foundations and clearance 37,000 sq ft structure area 45 days
27 Residential Villas Complete villa demolition, foundations and clearance 63,000 sq ft combined built-up area 4 months

On mobile, swipe the table sideways to see all columns.

Areas describe different scopes. Shreno’s figure covers demolition and dismantling work, including internal alterations. Other figures describe built-up or structure areas. Completion periods are records of these projects, rather than estimates for a new site.

About these projects

Frequently asked questions

What types of demolition projects are featured here?

These five projects cover multi-storey RCC apartment demolition, factory shed dismantling, internal shed alterations, paper mill demolition, an industrial lab building and unfinished residential villas. Each project page explains its individual scope.

Did BCM carry out all these projects as a direct contractor?

The projects include subcontract work. BCM was appointed by engineer Amarnath for the Shreno Limited shed works and by demolition contractor Uday Kumar for the 27-villa Ideal Pro project. These appointments are identified separately from the project company names.

Which projects included foundation removal and debris clearance?

Foundation removal and debris clearance formed part of the reported scopes at Malind Tropika Gardens, Devi Kiran Paper Mills, Exide Energy Solutions and the 27 residential villas. Shreno’s listed scope covers shed demolition, dismantling and internal alterations; foundation removal is not specified for that project.

Who retained the recovered demolition materials?

BCM took the recovered materials at Shreno Limited, Exide Energy Solutions and the 27-villa project under their respective arrangements. Material recovery was also part of the Malind and Devi Kiran scopes. The ownership and handling of recovered materials depend on each project’s agreement.

Can these completion times be used to estimate another project?

The durations show what was completed at these particular sites. For example, Devi Kiran’s 76,000 sq ft scope took 27 days, while Shreno’s demolition and internal alteration scope took five months. Structure type, access, surrounding operations, foundation work and the agreed scope all affect a new project’s schedule.

Where can I view project footage and supporting documents?

Select “View Project” on any card to open its full case study and site footage. The Malind case study includes an award letter, Devi Kiran includes a completion certificate, and Exide includes a work order. Supporting documents have not been added for the Shreno and 27-villa subcontract projects.