Malind Tropika Gardens High-Rise Building Demolition
Top-down demolition of a Basement + Ground + 9 upper-floor RCC building in Iggalur, Bengaluru. BCM Demolition Group completed the 2,25,000 sq. ft. project over four months, followed by site clearance and handover.
- Total built-up area
- 2,25,000 sq. ft.
- Building configuration
- B + G + 9 floors
- Demolition period
- 4 months
- Client
- BSCPL Infrastructure Ltd.
A planned approach to high-rise demolition
BCM Demolition Group carried out the demolition and dismantling of the RCC superstructure at Malind Tropika Gardens on Chandapura–Anekal Main Road. The building comprised a basement, ground floor and nine upper floors, with a total built-up area of two lakh twenty-five thousand square feet.
The work covered structural demolition, dismantling, foundation removal, debris clearance and material recovery. The completed scope concluded with a cleared site handed over to the client.
Scope of work
- Dismantling of non-structural building elements and services.
- Sequential top-down demolition of RCC slabs, beams, columns, staircases and lift core.
- Foundation removal and clearance of demolition debris.
- Segregation, loading and transportation of recovered materials.
- Final site clearance and handover.
Top-down demolition, carried out in sequence
The building was demolished progressively from the upper levels downwards. Sequential dismantling, excavator positioning and debris management were central to the execution of this project.
Preparation and mobilisation
Equipment mobilisation, access planning and preparation of the demolition work areas.
Sequential dismantling
Non-structural elements and reinforced concrete members dismantled as part of the top-down sequence.
Debris and material handling
Concrete debris and steel segregated for loading, transportation and recycling.
Clearance and handover
Remaining demolition materials removed and the cleared site handed over to the client.
Managing the structure, equipment and debris
| Challenge | Execution focus |
|---|---|
| Building height and demolition sequence | Controlled top-down working and attention to structural stability during sequential dismantling. |
| Reinforced concrete members | Progressive breaking and dismantling of slabs, beams, columns and other RCC elements. |
| Excavator positioning | Positioning and operation of the three excavators throughout the changing demolition work areas. |
| Heavy demolition debris | Ongoing segregation, handling and clearance of concrete and recovered steel. |
Demolition work videos
Watch footage supplied by BCM Demolition Group from the demolition works. Select play to load a video.
01 · Top-down demolition work
Footage of the demolition work in progress.
02 · Multi-storey building demolition
On-site demolition footage supplied for this project.
03 · Machine Working On Top Floor
A further view of the building demolishing from top floors to down.
04 · Building demolition footage
Additional footage from the high-rise demolition works.
Demolition completed. Site cleared and handed over.
The demolition work was completed over a four-month period, and the cleared site was safely handed over to the client.
Concrete debris and steel were segregated and sent for recycling. Non-recyclable materials were transported to authorised landfill facilities for disposal.
Letter of Award — pages 1 & 2
The supplied Letter of Award records the appointment of BCM Demolition Group for multi-storey building demolition at Survey No. 69/2, Iggalur Village, Anekal Taluk.
Document issuer: Malind Properties Private Limited.
Project name shown in the document: Bollineni REVITE.
Document date: 4 April 2026.