Example: A Site about Examples
Government Approved Demolition Contractor
Multi-storey apartment building at the Malind Tropika Gardens demolition project in Bengaluru
Project case studyIggalur · Bengaluru
Residential demolition · BengaluruCompleted project

Malind Tropika Gardens High-Rise Building Demolition

Top-down demolition of a Basement + Ground + 9 upper-floor RCC building in Iggalur, Bengaluru. BCM Demolition Group completed the 2,25,000 sq. ft. project over four months, followed by site clearance and handover.

Total built-up area
2,25,000 sq. ft.
Building configuration
B + G + 9 floors
Demolition period
4 months
Client
BSCPL Infrastructure Ltd.
01 · Project overview

A planned approach to high-rise demolition

BCM Demolition Group carried out the demolition and dismantling of the RCC superstructure at Malind Tropika Gardens on Chandapura–Anekal Main Road. The building comprised a basement, ground floor and nine upper floors, with a total built-up area of two lakh twenty-five thousand square feet.

The work covered structural demolition, dismantling, foundation removal, debris clearance and material recovery. The completed scope concluded with a cleared site handed over to the client.

Scope of work

  • Dismantling of non-structural building elements and services.
  • Sequential top-down demolition of RCC slabs, beams, columns, staircases and lift core.
  • Foundation removal and clearance of demolition debris.
  • Segregation, loading and transportation of recovered materials.
  • Final site clearance and handover.
02 · Method & equipment

Top-down demolition, carried out in sequence

The building was demolished progressively from the upper levels downwards. Sequential dismantling, excavator positioning and debris management were central to the execution of this project.

2 × TATA HitachiEX-200LC Prime excavators
1 × TATA HitachiEX-220LC Ultra excavator
  1. Preparation and mobilisation

    Equipment mobilisation, access planning and preparation of the demolition work areas.

  2. Sequential dismantling

    Non-structural elements and reinforced concrete members dismantled as part of the top-down sequence.

  3. Debris and material handling

    Concrete debris and steel segregated for loading, transportation and recycling.

  4. Clearance and handover

    Remaining demolition materials removed and the cleared site handed over to the client.

03 · Project challenges

Managing the structure, equipment and debris

ChallengeExecution focus
Building height and demolition sequenceControlled top-down working and attention to structural stability during sequential dismantling.
Reinforced concrete membersProgressive breaking and dismantling of slabs, beams, columns and other RCC elements.
Excavator positioningPositioning and operation of the three excavators throughout the changing demolition work areas.
Heavy demolition debrisOngoing segregation, handling and clearance of concrete and recovered steel.
04 · From the site

Demolition work videos

Watch footage supplied by BCM Demolition Group from the demolition works. Select play to load a video.

01 · Top-down demolition work

Footage of the demolition work in progress.

02 · Multi-storey building demolition

On-site demolition footage supplied for this project.

03 · Machine Working On Top Floor

A further view of the building demolishing from top floors to down.

04 · Building demolition footage

Additional footage from the high-rise demolition works.

05 · Completion & material recovery

Demolition completed. Site cleared and handed over.

The demolition work was completed over a four-month period, and the cleared site was safely handed over to the client.

Concrete debris and steel were segregated and sent for recycling. Non-recyclable materials were transported to authorised landfill facilities for disposal.

06 · Project record

Letter of Award — pages 1 & 2

The supplied Letter of Award records the appointment of BCM Demolition Group for multi-storey building demolition at Survey No. 69/2, Iggalur Village, Anekal Taluk.

Document issuer: Malind Properties Private Limited.
Project name shown in the document: Bollineni REVITE.
Document date: 4 April 2026.

This is a work award document. A client completion letter has not yet been added to this page.

Page 1 · Scope of workAppointment, project location and demolition scope.Tap the document to enlarge.
Page 2 · Terms & authorisationStatutory obligations, approved methodology and authorised signatory.Tap the document to enlarge.
Letter of Award
error: Content is protected !!