Old Safety Lab BuildingDemolition at Exide Energy Solutions
Demolition of a 37,000 sq ft single-storey RCC building at Exide Energy Solutions in Polanahalli, Bengaluru Rural. BCM’s 45-day scope covered MS barricading, structural demolition, foundation removal, material recovery and debris clearance.
- Structure area
- 37,000 sq ft
- Completion time
- 45 days
- Approximate height
- 25 ft
- Workforce
- 15+ workers
RCC demolition within an operating battery plant
BCM Demolition Group carried out the demolition of the Old Safety Lab building for Exide Energy Solutions. The single-storey reinforced cement concrete structure covered approximately 37,000 sq ft and stood about 25 feet high.
The surrounding battery plant was operational, making separation of the demolition area and attention to nearby activities central to the work.
Scope of work
- MS barricading around the demolition work area.
- Mechanical demolition of the RCC superstructure.
- Removal of the building foundations.
- Recovery and segregation of dismantled materials.
- Removal of demolition debris and site clearance.
Mechanical demolition and foundation removal
Two Tata Hitachi ZX-220 LC excavators and a workforce of more than 15 workers were deployed for demolition, material handling and clearance.
Work sequence
- Barricade the demolition area with MS barriers.
- Carry out mechanical demolition of the RCC building.
- Remove foundations and segregate recovered materials.
- Load and remove demolition debris to clear the work area.
Working beside an operational battery plant
The main challenge was carrying out heavy concrete demolition within a running battery plant. The work required particular attention to the boundary between the demolition zone and surrounding plant activities.
MS barricading formed part of BCM’s scope to separate the work area. The two excavators handled the heavy RCC demolition and foundation removal, supported by the site workforce.
A 45-day demolition and clearance scope
BCM completed the building demolition, foundation removal and debris clearance over 45 days.
Recovered materials were taken by BCM Demolition Group as part of the project scope.
Barricading the demolition area