Example: A Site about Examples
Government Approved Demolition Contractor
Call BCM 96633 44854
Residential Demolition Sub-Service Pages — BCM Demolition Group

▸ File 01 / 05 — House Demolition

Service File Ref RD-01

House Demolition in Bangalore

Safe, dust-controlled demolition of independent houses on 20×30, 30×40 and 40×60 sites — including foundation removal and complete debris clearance.

Licensed & Insured Permits Handled Debris Included
House demolition in Bangalore
Plate 01 · House DemolitionBengaluru
Live
DURATION 4 – 7 DAYS SIZE RANGE 800 – 4,000 SQ.FT MACHINERY 3T – 20T EXCAVATOR CREW 6 – 10 WORKERS LICENCE 1781 48 4212 SURVEY FREE · 24 HOURS DURATION 4 – 7 DAYS SIZE RANGE 800 – 4,000 SQ.FT MACHINERY 3T – 20T EXCAVATOR CREW 6 – 10 WORKERS LICENCE 1781 48 4212 SURVEY FREE · 24 HOURS
Duration4 – 7 Days
Size Range800 – 4,000 sq.ft
Machinery3T – 20T Excavator
Crew6 – 10 Workers
01Overview

Independent House Demolition

What we handle, and how we approach the two structure types found across Bangalore.

Most Bangalore houses built before 2005 are load-bearing brick or stone masonry, where the walls themselves carry the roof. Newer homes are RCC framed with a column-and-beam skeleton. We identify which you have during the free survey, because each demands a completely different demolition sequence.

Every job starts with a soft strip — doors, windows, grills, wiring and fittings removed by hand. Machinery then works top-down with continuous water-mist dust suppression, and debris is cleared daily so your street stays usable throughout.

Foundations and the plinth are removed as standard, so the plot is handed back level, compacted and ready for your new foundation to be marked out immediately.

02Method

How It Works

Four stages from your first call to a cleared, level plot.

01
Free Survey

Engineer visits within 24 hours to assess structure, access and salvage.

02
Permits

BBMP application plus BESCOM and BWSSB disconnections filed by us.

03
Demolition

Soft strip, then controlled top-down dismantling with dust control.

04
Handover

Debris removed, plot levelled, disposal documents handed over.

03Site Record

House Demolition In Progress

Photographs from recent independent house projects across Bengaluru.

Frame 01 House demolition site Bangalore
Structural DismantlingTop-Down Method
Frame 02 House demolition machinery Bangalore
Excavator On SiteDust Suppression Active
Frame 03 House demolition debris clearance Bangalore
Debris ClearancePlot Levelled
04Questions

House Demolition FAQs

Q1How long does house demolition take?
A standard independent house takes 4–7 working days including debris clearance. Permit approval adds 5–10 days before work begins.
Q2Do I need BBMP permission?
Yes — plus BESCOM and BWSSB disconnection certificates. We file everything on your behalf.
Q3Is debris removal included?
Yes. Removal, disposal at approved yards and plot levelling are all standard scope.
Q4What if my road is very narrow?
We use 3-tonne mini excavators that fit six-foot gaps, or switch to manual dismantling. No site is too tight.

Ready to demolish your house?

Free site survey within 24 hours. Permits handled, debris cleared, plot levelled — no obligation.

▸ File 02 / 05 — Villa Demolition

Service File Ref RD-02

Villa Demolition in Bangalore

Complete villa demolition including gated community approvals, premium finish recovery, deep foundation removal and swimming pool demolition.

RWA Coordination Finish Recovery Pool Demolition
Villa demolition in Bangalore
Plate 02 · Villa DemolitionBengaluru
Live
DURATION 6 – 12 DAYS SIZE RANGE 2,000 – 8,000 SQ.FT MACHINERY 20T + BREAKER APPROVALS BBMP + RWA LICENCE 1781 48 4212 SURVEY FREE · 24 HOURS DURATION 6 – 12 DAYS SIZE RANGE 2,000 – 8,000 SQ.FT MACHINERY 20T + BREAKER APPROVALS BBMP + RWA LICENCE 1781 48 4212 SURVEY FREE · 24 HOURS
Duration6 – 12 Days
Size Range2,000 – 8,000 sq.ft
Machinery20T + Breaker
ApprovalsBBMP + RWA
01Overview

Gated Community Villa Demolition

Why villas need a different approach from ordinary independent houses.

Villas are almost always RCC framed with deeper raft or pile foundations, which means hydraulic breakers and rebar shears rather than straightforward masonry demolition. They also carry finishes genuinely worth recovering — teak joinery, imported tiles, modular kitchens and solar heaters.

Many sit inside gated communities with strict association rules. Our teams handle RWA approvals, gate passes, permitted working hours, resident notices and common-area protection, so the association has no reason to halt your project midway.

Pools, decks, gazebos, water features and boundary walls are all scoped alongside the main structure during the survey.

02Method

How It Works

Four stages with association coordination built in from day one.

01
Survey & RWA

Site assessment plus initial discussion with your association.

02
Approvals

BBMP permits, utility NOCs and RWA clearance obtained.

03
Strip & Demolish

Premium finishes recovered, then staged structural dismantling.

04
Clear & Level

Foundations removed, debris hauled out, plot handed over.

03Site Record

Villa Demolition In Progress

Photographs from recent villa projects across Bengaluru's gated communities.

Frame 01 Villa demolition site Bangalore
Soft Strip StageFinish Recovery
Frame 02 Villa structural demolition Bangalore
RCC DismantlingHydraulic Breaker
Frame 03 Villa foundation removal Bangalore
Foundation RemovalRaft & Pile Caps
04Questions

Villa Demolition FAQs

Q1Will you deal with my RWA?
Yes. We handle approvals, gate passes, working-hour agreements and resident notices directly with your association.
Q2Can you demolish the swimming pool?
Yes — pools, decks, gazebos, water features and boundary walls are all included when scoped during the survey.
Q3What happens to teak doors and tiles?
Removed intact during soft strip, catalogued and credited back against your invoice — never quietly retained.
Q4How deep are foundations removed?
Fully. Raft slabs, pile caps and plinth beams are broken out so the plot is ready for fresh construction.

Planning a villa demolition?

We'll survey the property, speak to your RWA and give you a clear written scope within 24 hours.

▸ File 03 / 05 — Apartment Demolition

Service File Ref RD-03

Apartment Demolition in Bangalore

Full block demolition and single-flat interior strip-out — carried out safely inside occupied buildings with structural engineer sign-off.

Engineer Certified Occupied-Safe Lift-Safe Debris
Apartment demolition in Bangalore
Plate 03 · Apartment DemolitionBengaluru
Live
DURATION 3 DAYS – 5 WEEKS SIZE RANGE 1,000 – 40,000 SQ.FT MACHINERY LONG-REACH + SAWS CREW 10 – 25 WORKERS LICENCE 1781 48 4212 SURVEY FREE · 24 HOURS DURATION 3 DAYS – 5 WEEKS SIZE RANGE 1,000 – 40,000 SQ.FT MACHINERY LONG-REACH + SAWS CREW 10 – 25 WORKERS LICENCE 1781 48 4212 SURVEY FREE · 24 HOURS
Duration3 Days – 5 Weeks
Size Range1,000 – 40,000 sq.ft
MachineryLong-Reach + Saws
Crew10 – 25 Workers
01Overview

Blocks & Single Flats

Two very different services under one heading — both delivered around residents who stay put.

Apartment work is the most technically demanding residential category because it happens surrounded by families who still live there. Noise, dust, debris routes and structural safety all have to be managed simultaneously.

Full block demolition uses strict top-down sequencing — slab by slab, floor by floor, with perimeter safety netting. Never uncontrolled collapse, and never explosives in a residential area.

Single flat strip-out removes only interiors. A structural engineer certifies exactly which partitions can safely come out before anyone lifts a hammer, protecting the building's load path completely.

02Method

How It Works

Four stages, planned around residents who stay in the building.

01
Survey & Report

Structural assessment and engineer certification of the scope.

02
Notices & Access

Resident notices, lift bookings and noise-window agreements.

03
Controlled Work

Netting installed, then staged dismantling with dust control.

04
Clear & Restore

Debris removed, common areas cleaned, site handed over.

03Site Record

Apartment Demolition In Progress

Photographs from recent block demolition and flat strip-out projects.

Frame 01 Apartment block demolition Bangalore
Top-Down SequencingSlab By Slab
Frame 02 Apartment flat strip-out Bangalore
Interior Strip-OutOccupied Building
Frame 03 Apartment safety netting Bangalore
Perimeter NettingResident Protection
04Questions

Apartment Demolition FAQs

Q1Can you strip one flat while others are occupied?
Yes. Non-load-bearing walls, flooring, kitchens and bathrooms are removed with a structural engineer certifying the scope first.
Q2How is debris taken out of upper floors?
Bagged, weighed and carried via the service lift or an external chute. Common areas are protected and cleaned daily.
Q3Do you work within society noise hours?
Always. Working windows are agreed with your association in advance and followed strictly.
Q4Is explosive demolition ever used?
No. All apartment work is controlled mechanical top-down dismantling — safer and far less disruptive.

Demolishing a block or stripping a flat?

Free structural survey and engineer-certified scope within 24 hours. Association coordination included.

▸ File 04 / 05 — Bungalow Demolition

Service File Ref RD-04

Bungalow Demolition in Bangalore

Careful demolition of old Bangalore bungalows with hand recovery of teak, Mangalore tiles, Athangudi flooring and antique fittings.

Salvage-First Tree NOC Handled Hand Recovery
Bungalow demolition in Bangalore
Plate 04 · Bungalow DemolitionBengaluru
Live
DURATION 7 – 14 DAYS SIZE RANGE 1,500 – 10,000 SQ.FT METHOD HAND + MACHINE CONSTRUCTION STONE & TIMBER LICENCE 1781 48 4212 SURVEY FREE · 24 HOURS DURATION 7 – 14 DAYS SIZE RANGE 1,500 – 10,000 SQ.FT METHOD HAND + MACHINE CONSTRUCTION STONE & TIMBER LICENCE 1781 48 4212 SURVEY FREE · 24 HOURS
Duration7 – 14 Days
Size Range1,500 – 10,000 sq.ft
MethodHand + Machine
ConstructionStone & Timber
01Overview

Heritage Bungalow Demolition

Old Bangalore homes hold material that deserves recovering, not crushing.

Bungalows in Basavanagudi, Malleshwaram, Jayanagar and Richmond Town were built with thick cut-stone walls, teak rafters, Mangalore tile roofs and Athangudi flooring — material that simply cannot be bought new today.

We approach these salvage-first. Roof tiles, timber trusses, rosewood doors, cast-iron grills and antique brass fittings are removed by hand and catalogued before machinery is ever brought onto the site.

The trade-off is time. Hand recovery and thick masonry mean these jobs run longer than a standard house — but the extra days protect material of real value.

02Method

How It Works

Four stages, with recovery prioritised over speed.

01
Survey & Catalogue

Structure assessed and all salvageable heritage material listed.

02
Permits & Trees

BBMP demolition permission plus tree NOC where required.

03
Hand Recovery

Roof tiles, timber and fittings removed carefully by hand.

04
Demolish & Clear

Stone walls broken down, debris removed, plot levelled.

03Site Record

Bungalow Demolition In Progress

Photographs from recent heritage bungalow projects across old Bengaluru.

Frame 01 Bungalow roof tile recovery Bangalore
Roof Tile RecoveryRemoved By Hand
Frame 02 Bungalow timber salvage Bangalore
Timber SalvageTeak & Rosewood
Frame 03 Bungalow stone wall demolition Bangalore
Stone Wall BreakingHeavy Breaker
04Questions

Bungalow Demolition FAQs

Q1What happens to the teak and roof tiles?
Removed by hand, catalogued and credited back to you. Bungalows recover the most salvage value of any residential category.
Q2Why does it take longer than a house?
Recovery is done by hand before machinery arrives, and thick stone walls resist impact. The extra days protect valuable material.
Q3There are old trees on my plot.
Mature trees may be protected. We arrange BBMP Forest Cell permission where removal is genuinely needed, or work around them.
Q4Can you handle outhouses and wells?
Yes — servant quarters, garages, compound walls and open wells are all scoped and cleared with the main structure.

Own an old Bangalore bungalow?

We'll survey the property, catalogue everything worth saving and give you a clear written scope within 24 hours.

▸ File 05 / 05 — Building Demolition

Service File Ref RD-05

Building Demolition in Bangalore

Engineered demolition of multi-storey residential buildings, PG and hostel blocks, and abandoned or unfinished RCC structures.

Method Statement Stability Report Rebar Recovery
Residential building demolition in Bangalore
Plate 05 · Building DemolitionBengaluru
Live
DURATION 2 – 6 WEEKS SIZE RANGE 3,000 – 60,000 SQ.FT MACHINERY LONG-REACH + CRANE CREW 15 – 30 WORKERS LICENCE 1781 48 4212 SURVEY FREE · 24 HOURS DURATION 2 – 6 WEEKS SIZE RANGE 3,000 – 60,000 SQ.FT MACHINERY LONG-REACH + CRANE CREW 15 – 30 WORKERS LICENCE 1781 48 4212 SURVEY FREE · 24 HOURS
Duration2 – 6 Weeks
Size Range3,000 – 60,000 sq.ft
MachineryLong-Reach + Crane
Crew15 – 30 Workers
01Overview

Multi-Storey Building Demolition

Engineered sequencing for heavy RCC structures — not brute force.

This covers multi-storey residential blocks, mixed-use buildings, PG and hostel structures, and stalled construction that needs clearing. All are RCC framed with substantial rebar content.

Every project begins with a structural stability report identifying load-bearing columns, cantilevers and transfer beams. A written method statement then sets out the exact demolition sequence, machinery positions and exclusion zones before work starts.

Concrete is crushed on site and reinforcement steel separated, bundled and weighed transparently. Basements, stilt columns, retaining walls and lift pits are all removed where scoped.

02Method

How It Works

Four stages, engineered from the first day to the last.

01
Structural Report

Load paths, columns and transfer beams mapped by our engineer.

02
Method Statement

Written sequence, machinery plan and exclusion zones issued.

03
Staged Demolition

Top-down floor-by-floor dismantling with netting and dust control.

04
Clear & Level

RCC crushed, steel separated, basement removed, plot levelled.

03Site Record

Building Demolition In Progress

Photographs from recent multi-storey and unfinished structure projects.

Frame 01 Multi-storey building demolition Bangalore
Long-Reach MachineFloor By Floor
Frame 02 RCC frame demolition Bangalore
RCC Frame RemovalRebar Separated
Frame 03 Building site clearance Bangalore
Site ClearanceBasement Removed
04Questions

Building Demolition FAQs

Q1Can you clear an unfinished structure?
Yes. Stalled construction is a common job — the frame is dismantled, rebar recovered and the plot handed back ready for fresh work.
Q2How high can you go?
Long-reach excavators handle most residential heights. Above that we work top-down from a debris ramp, with crane support for steel elements.
Q3Is the basement removed too?
Yes when scoped — basement slabs, retaining walls, lift pits and stilt columns are all broken out and cleared.
Q4Do you provide documentation?
Every project gets a stability report, written method statement and C&D waste disposal manifests on completion.

Clearing a multi-storey building?

Free structural survey, written method statement and clear scope within 24 hours. Permits fully handled.

evice-width, initial-scale=1.0"> Residential Demolition Sub-Service Pages — BCM Demolition Group

▸ File 01 / 05 — House Demolition

Service File Ref RD-01

House Demolition in Bangalore

Safe, dust-controlled demolition of independent houses on 20×30, 30×40 and 40×60 sites — including foundation removal and complete debris clearance.

Licensed & Insured Permits Handled Debris Included
House demolition in Bangalore
Plate 01 · House DemolitionBengaluru
Live
DURATION 4 – 7 DAYS SIZE RANGE 800 – 4,000 SQ.FT MACHINERY 3T – 20T EXCAVATOR CREW 6 – 10 WORKERS LICENCE 1781 48 4212 SURVEY FREE · 24 HOURS DURATION 4 – 7 DAYS SIZE RANGE 800 – 4,000 SQ.FT MACHINERY 3T – 20T EXCAVATOR CREW 6 – 10 WORKERS LICENCE 1781 48 4212 SURVEY FREE · 24 HOURS
Duration4 – 7 Days
Size Range800 – 4,000 sq.ft
Machinery3T – 20T Excavator
Crew6 – 10 Workers
01Overview

Independent House Demolition

What we handle, and how we approach the two structure types found across Bangalore.

Most Bangalore houses built before 2005 are load-bearing brick or stone masonry, where the walls themselves carry the roof. Newer homes are RCC framed with a column-and-beam skeleton. We identify which you have during the free survey, because each demands a completely different demolition sequence.

Every job starts with a soft strip — doors, windows, grills, wiring and fittings removed by hand. Machinery then works top-down with continuous water-mist dust suppression, and debris is cleared daily so your street stays usable throughout.

Foundations and the plinth are removed as standard, so the plot is handed back level, compacted and ready for your new foundation to be marked out immediately.

02Method

How It Works

Four stages from your first call to a cleared, level plot.

01
Free Survey

Engineer visits within 24 hours to assess structure, access and salvage.

02
Permits

BBMP application plus BESCOM and BWSSB disconnections filed by us.

03
Demolition

Soft strip, then controlled top-down dismantling with dust control.

04
Handover

Debris removed, plot levelled, disposal documents handed over.

03Site Record

House Demolition In Progress

Photographs from recent independent house projects across Bengaluru.

Frame 01 House demolition site Bangalore
Structural DismantlingTop-Down Method
Frame 02 House demolition machinery Bangalore
Excavator On SiteDust Suppression Active
Frame 03 House demolition debris clearance Bangalore
Debris ClearancePlot Levelled
04Questions

House Demolition FAQs

Q1How long does house demolition take?
A standard independent house takes 4–7 working days including debris clearance. Permit approval adds 5–10 days before work begins.
Q2Do I need BBMP permission?
Yes — plus BESCOM and BWSSB disconnection certificates. We file everything on your behalf.
Q3Is debris removal included?
Yes. Removal, disposal at approved yards and plot levelling are all standard scope.
Q4What if my road is very narrow?
We use 3-tonne mini excavators that fit six-foot gaps, or switch to manual dismantling. No site is too tight.

Ready to demolish your house?

Free site survey within 24 hours. Permits handled, debris cleared, plot levelled — no obligation.

▸ File 02 / 05 — Villa Demolition

Service File Ref RD-02

Villa Demolition in Bangalore

Complete villa demolition including gated community approvals, premium finish recovery, deep foundation removal and swimming pool demolition.

RWA Coordination Finish Recovery Pool Demolition
Villa demolition in Bangalore
Plate 02 · Villa DemolitionBengaluru
Live
DURATION 6 – 12 DAYS SIZE RANGE 2,000 – 8,000 SQ.FT MACHINERY 20T + BREAKER APPROVALS BBMP + RWA LICENCE 1781 48 4212 SURVEY FREE · 24 HOURS DURATION 6 – 12 DAYS SIZE RANGE 2,000 – 8,000 SQ.FT MACHINERY 20T + BREAKER APPROVALS BBMP + RWA LICENCE 1781 48 4212 SURVEY FREE · 24 HOURS
Duration6 – 12 Days
Size Range2,000 – 8,000 sq.ft
Machinery20T + Breaker
ApprovalsBBMP + RWA
01Overview

Gated Community Villa Demolition

Why villas need a different approach from ordinary independent houses.

Villas are almost always RCC framed with deeper raft or pile foundations, which means hydraulic breakers and rebar shears rather than straightforward masonry demolition. They also carry finishes genuinely worth recovering — teak joinery, imported tiles, modular kitchens and solar heaters.

Many sit inside gated communities with strict association rules. Our teams handle RWA approvals, gate passes, permitted working hours, resident notices and common-area protection, so the association has no reason to halt your project midway.

Pools, decks, gazebos, water features and boundary walls are all scoped alongside the main structure during the survey.

02Method

How It Works

Four stages with association coordination built in from day one.

01
Survey & RWA

Site assessment plus initial discussion with your association.

02
Approvals

BBMP permits, utility NOCs and RWA clearance obtained.

03
Strip & Demolish

Premium finishes recovered, then staged structural dismantling.

04
Clear & Level

Foundations removed, debris hauled out, plot handed over.

03Site Record

Villa Demolition In Progress

Photographs from recent villa projects across Bengaluru's gated communities.

Frame 01 Villa demolition site Bangalore
Soft Strip StageFinish Recovery
Frame 02 Villa structural demolition Bangalore
RCC DismantlingHydraulic Breaker
Frame 03 Villa foundation removal Bangalore
Foundation RemovalRaft & Pile Caps
04Questions

Villa Demolition FAQs

Q1Will you deal with my RWA?
Yes. We handle approvals, gate passes, working-hour agreements and resident notices directly with your association.
Q2Can you demolish the swimming pool?
Yes — pools, decks, gazebos, water features and boundary walls are all included when scoped during the survey.
Q3What happens to teak doors and tiles?
Removed intact during soft strip, catalogued and credited back against your invoice — never quietly retained.
Q4How deep are foundations removed?
Fully. Raft slabs, pile caps and plinth beams are broken out so the plot is ready for fresh construction.

Planning a villa demolition?

We'll survey the property, speak to your RWA and give you a clear written scope within 24 hours.

▸ File 03 / 05 — Apartment Demolition

Service File Ref RD-03

Apartment Demolition in Bangalore

Full block demolition and single-flat interior strip-out — carried out safely inside occupied buildings with structural engineer sign-off.

Engineer Certified Occupied-Safe Lift-Safe Debris
Apartment demolition in Bangalore
Plate 03 · Apartment DemolitionBengaluru
Live
DURATION 3 DAYS – 5 WEEKS SIZE RANGE 1,000 – 40,000 SQ.FT MACHINERY LONG-REACH + SAWS CREW 10 – 25 WORKERS LICENCE 1781 48 4212 SURVEY FREE · 24 HOURS DURATION 3 DAYS – 5 WEEKS SIZE RANGE 1,000 – 40,000 SQ.FT MACHINERY LONG-REACH + SAWS CREW 10 – 25 WORKERS LICENCE 1781 48 4212 SURVEY FREE · 24 HOURS
Duration3 Days – 5 Weeks
Size Range1,000 – 40,000 sq.ft
MachineryLong-Reach + Saws
Crew10 – 25 Workers
01Overview

Blocks & Single Flats

Two very different services under one heading — both delivered around residents who stay put.

Apartment work is the most technically demanding residential category because it happens surrounded by families who still live there. Noise, dust, debris routes and structural safety all have to be managed simultaneously.

Full block demolition uses strict top-down sequencing — slab by slab, floor by floor, with perimeter safety netting. Never uncontrolled collapse, and never explosives in a residential area.

Single flat strip-out removes only interiors. A structural engineer certifies exactly which partitions can safely come out before anyone lifts a hammer, protecting the building's load path completely.

02Method

How It Works

Four stages, planned around residents who stay in the building.

01
Survey & Report

Structural assessment and engineer certification of the scope.

02
Notices & Access

Resident notices, lift bookings and noise-window agreements.

03
Controlled Work

Netting installed, then staged dismantling with dust control.

04
Clear & Restore

Debris removed, common areas cleaned, site handed over.

03Site Record

Apartment Demolition In Progress

Photographs from recent block demolition and flat strip-out projects.

Frame 01 Apartment block demolition Bangalore
Top-Down SequencingSlab By Slab
Frame 02 Apartment flat strip-out Bangalore
Interior Strip-OutOccupied Building
Frame 03 Apartment safety netting Bangalore
Perimeter NettingResident Protection
04Questions

Apartment Demolition FAQs

Q1Can you strip one flat while others are occupied?
Yes. Non-load-bearing walls, flooring, kitchens and bathrooms are removed with a structural engineer certifying the scope first.
Q2How is debris taken out of upper floors?
Bagged, weighed and carried via the service lift or an external chute. Common areas are protected and cleaned daily.
Q3Do you work within society noise hours?
Always. Working windows are agreed with your association in advance and followed strictly.
Q4Is explosive demolition ever used?
No. All apartment work is controlled mechanical top-down dismantling — safer and far less disruptive.

Demolishing a block or stripping a flat?

Free structural survey and engineer-certified scope within 24 hours. Association coordination included.

▸ File 04 / 05 — Bungalow Demolition

Service File Ref RD-04

Bungalow Demolition in Bangalore

Careful demolition of old Bangalore bungalows with hand recovery of teak, Mangalore tiles, Athangudi flooring and antique fittings.

Salvage-First Tree NOC Handled Hand Recovery
Bungalow demolition in Bangalore
Plate 04 · Bungalow DemolitionBengaluru
Live
DURATION 7 – 14 DAYS SIZE RANGE 1,500 – 10,000 SQ.FT METHOD HAND + MACHINE CONSTRUCTION STONE & TIMBER LICENCE 1781 48 4212 SURVEY FREE · 24 HOURS DURATION 7 – 14 DAYS SIZE RANGE 1,500 – 10,000 SQ.FT METHOD HAND + MACHINE CONSTRUCTION STONE & TIMBER LICENCE 1781 48 4212 SURVEY FREE · 24 HOURS
Duration7 – 14 Days
Size Range1,500 – 10,000 sq.ft
MethodHand + Machine
ConstructionStone & Timber
01Overview

Heritage Bungalow Demolition

Old Bangalore homes hold material that deserves recovering, not crushing.

Bungalows in Basavanagudi, Malleshwaram, Jayanagar and Richmond Town were built with thick cut-stone walls, teak rafters, Mangalore tile roofs and Athangudi flooring — material that simply cannot be bought new today.

We approach these salvage-first. Roof tiles, timber trusses, rosewood doors, cast-iron grills and antique brass fittings are removed by hand and catalogued before machinery is ever brought onto the site.

The trade-off is time. Hand recovery and thick masonry mean these jobs run longer than a standard house — but the extra days protect material of real value.

02Method

How It Works

Four stages, with recovery prioritised over speed.

01
Survey & Catalogue

Structure assessed and all salvageable heritage material listed.

02
Permits & Trees

BBMP demolition permission plus tree NOC where required.

03
Hand Recovery

Roof tiles, timber and fittings removed carefully by hand.

04
Demolish & Clear

Stone walls broken down, debris removed, plot levelled.

03Site Record

Bungalow Demolition In Progress

Photographs from recent heritage bungalow projects across old Bengaluru.

Frame 01 Bungalow roof tile recovery Bangalore
Roof Tile RecoveryRemoved By Hand
Frame 02 Bungalow timber salvage Bangalore
Timber SalvageTeak & Rosewood
Frame 03 Bungalow stone wall demolition Bangalore
Stone Wall BreakingHeavy Breaker
04Questions

Bungalow Demolition FAQs

Q1What happens to the teak and roof tiles?
Removed by hand, catalogued and credited back to you. Bungalows recover the most salvage value of any residential category.
Q2Why does it take longer than a house?
Recovery is done by hand before machinery arrives, and thick stone walls resist impact. The extra days protect valuable material.
Q3There are old trees on my plot.
Mature trees may be protected. We arrange BBMP Forest Cell permission where removal is genuinely needed, or work around them.
Q4Can you handle outhouses and wells?
Yes — servant quarters, garages, compound walls and open wells are all scoped and cleared with the main structure.

Own an old Bangalore bungalow?

We'll survey the property, catalogue everything worth saving and give you a clear written scope within 24 hours.

▸ File 05 / 05 — Building Demolition

Service File Ref RD-05

Building Demolition in Bangalore

Engineered demolition of multi-storey residential buildings, PG and hostel blocks, and abandoned or unfinished RCC structures.

Method Statement Stability Report Rebar Recovery
Residential building demolition in Bangalore
Plate 05 · Building DemolitionBengaluru
Live
DURATION 2 – 6 WEEKS SIZE RANGE 3,000 – 60,000 SQ.FT MACHINERY LONG-REACH + CRANE CREW 15 – 30 WORKERS LICENCE 1781 48 4212 SURVEY FREE · 24 HOURS DURATION 2 – 6 WEEKS SIZE RANGE 3,000 – 60,000 SQ.FT MACHINERY LONG-REACH + CRANE CREW 15 – 30 WORKERS LICENCE 1781 48 4212 SURVEY FREE · 24 HOURS
Duration2 – 6 Weeks
Size Range3,000 – 60,000 sq.ft
MachineryLong-Reach + Crane
Crew15 – 30 Workers
01Overview

Multi-Storey Building Demolition

Engineered sequencing for heavy RCC structures — not brute force.

This covers multi-storey residential blocks, mixed-use buildings, PG and hostel structures, and stalled construction that needs clearing. All are RCC framed with substantial rebar content.

Every project begins with a structural stability report identifying load-bearing columns, cantilevers and transfer beams. A written method statement then sets out the exact demolition sequence, machinery positions and exclusion zones before work starts.

Concrete is crushed on site and reinforcement steel separated, bundled and weighed transparently. Basements, stilt columns, retaining walls and lift pits are all removed where scoped.

02Method

How It Works

Four stages, engineered from the first day to the last.

01
Structural Report

Load paths, columns and transfer beams mapped by our engineer.

02
Method Statement

Written sequence, machinery plan and exclusion zones issued.

03
Staged Demolition

Top-down floor-by-floor dismantling with netting and dust control.

04
Clear & Level

RCC crushed, steel separated, basement removed, plot levelled.

03Site Record

Building Demolition In Progress

Photographs from recent multi-storey and unfinished structure projects.

Frame 01 Multi-storey building demolition Bangalore
Long-Reach MachineFloor By Floor
Frame 02 RCC frame demolition Bangalore
RCC Frame RemovalRebar Separated
Frame 03 Building site clearance Bangalore
Site ClearanceBasement Removed
04Questions

Building Demolition FAQs

Q1Can you clear an unfinished structure?
Yes. Stalled construction is a common job — the frame is dismantled, rebar recovered and the plot handed back ready for fresh work.
Q2How high can you go?
Long-reach excavators handle most residential heights. Above that we work top-down from a debris ramp, with crane support for steel elements.
Q3Is the basement removed too?
Yes when scoped — basement slabs, retaining walls, lift pits and stilt columns are all broken out and cleared.
Q4Do you provide documentation?
Every project gets a stability report, written method statement and C&D waste disposal manifests on completion.

Clearing a multi-storey building?

Free structural survey, written method statement and clear scope within 24 hours. Permits fully handled.

Residential Demolition Contractor Near You

Our Services

Need Any Help?

We're here for you! Contact us for expert advice, free consultations, and personalized solutions for all your demolition needs.

RESIDENTIAL DEMOLITION SERVICES IN BANGALORE

BCM Demolition Group works on buildings and House Demolition but we also do a lot ofresidential house demolition contractors near me work. In fact, we love working with homeowners and new property owners who are looking to remove or tear down the existing building for a new home build. Not only do we tear down, but we will complete the grading and excavation as required to get the new home built.

Residential environment plays a large part in how we approach demolition work and we take a good amount of time to understand all of the requirements so we can guide you in the right course of the project. Old House demolition Services In Bangalore, takes on the challenge of working in fairly tight situations most of the time. Of course, each project is unique but we are always prepared to work in close quarters and employ safety first techniques in the razing of residential structures.

Residential demolition services near me includes exterior, bricks demolition, excavation, contaminated soil removal, site grading, rubbish removal and much more. BCM Building Demolition Contractor In Bangalore, make the demolition process simple, and we always remove all debris from the sit

Scroll to Top