Completed projectTop-down methodDirect client

Malind Tropika Gardens High-Rise Building Demolition

We demolished a Basement + Ground + 9-floor RCC building in Iggalur, Bengaluru, using the top-down method. The 2,25,000 sq. ft. project took 4 months, followed by site clearance and handover.

Multi-storey apartment building at the Malind Tropika Gardens demolition project in Bengaluru
Project case studyIggalur · Bengaluru
Built-up area
2,25,000 sq. ft.
Building
B + G + 9 floors
Time taken
4 months
Client
BSCPL Infrastructure Ltd.
Overview

Project overview

BCM Demolition Group demolished the RCC building at Malind Tropika Gardens on Chandapura–Anekal Main Road. The building had a basement, a ground floor and nine upper floors, with a total built-up area of 2,25,000 sq. ft.

The work included demolition, dismantling, foundation removal, debris clearance and material recovery. The cleared site was then handed over to the client.

Scope of work

  • Removal of non-structural parts and building services.
  • Top-down demolition of slabs, beams, columns, staircases and the lift core.
  • Foundation removal and debris clearance.
  • Sorting, loading and transport of recovered materials.
  • Final site clearance and handover.
Method

How the work was done

We demolished the building floor by floor, from the top down. Careful sequencing, excavator positioning and debris handling were key to the job.

During top-down demolition 3 excavators
  • 2 × TATA Hitachi EX-200LC Prime
  • 1 × TATA Hitachi EX-220LC Ultra
After the top-down work 5 excavators in total

The fleet was increased to 5 excavators for the work after the top-down demolition.

  1. Preparation

    Machines brought to site, access planned and work areas prepared.

  2. Top-down dismantling

    Non-structural parts and concrete members removed floor by floor.

  3. Debris handling

    Concrete and steel sorted for loading, transport and recycling.

  4. Clearance & handover

    Remaining material removed and the clear site handed to the client.

Challenges

Key challenges and how we handled them

01

Building height

Controlled top-down work, keeping the structure stable at every stage.

02

Reinforced concrete

Slabs, beams, columns and other RCC parts broken and removed step by step.

03

Excavator positioning

Excavators placed and moved carefully as the work areas changed.

04

Heavy debris

Concrete and recovered steel sorted, handled and cleared throughout the job.

Videos

Site videos

Videos from the demolition work. Tap play to watch.

01Top-down demolition

Demolition work in progress.

02Multi-storey demolition

On-site footage from this project.

03Machine on the top floor

The building being demolished from the top floors down.

04High-rise demolition

More footage from the demolition work.

Result

Completed in 4 months and handed over

The demolition was completed in four months, and the cleared site was safely handed over to the client.

Concrete and steel were sorted and sent for recycling. Materials that could not be recycled went to authorised landfill sites.

Site handed over to the client

Where the materials went

ConcreteRecycled
SteelRecycled
Non-recyclableAuthorised landfill
SiteCleared and handed over
Award letter

Letter of Award

This letter confirms that BCM Demolition Group was appointed to demolish the multi-storey building at Survey No. 69/2, Iggalur Village, Anekal Taluk.

Issued by
Malind Properties Private Limited
Project name in letter
Bollineni REVITE
Date
4 April 2026
Pages
2

This is the work award letter. A client completion letter has not been added yet.

Page 1 · Scope of workAppointment, location and scope.
Page 2 · Terms & signatureObligations, method and authorised signatory.
FAQs

Common questions

What building was demolished?

A multi-storey RCC building with a basement, ground floor and nine upper floors (B + G + 9). Its total built-up area was 2,25,000 sq. ft.

Which method was used?

Top-down demolition. The building was taken down floor by floor from the top, including slabs, beams, columns, staircases and the lift core.

How many excavators were used?

Three excavators during the top-down demolition: two TATA Hitachi EX-200LC Prime and one TATA Hitachi EX-220LC Ultra. After the top-down work, 5 excavators were used in total.

How long did it take?

Four months, followed by site clearance and handover to the client.

What happened to the materials?

Concrete and steel were sorted and sent for recycling. Materials that could not be recycled went to authorised landfill sites.

Is there proof of BCM’s appointment?

Yes. The Letter of Award from Malind Properties Private Limited, dated 4 April 2026, is shown on this page. A client completion letter has not been added yet.